DATE:
     
    PAGE OF
     
     
     
     
    FIRST ARTICLE INSPECTION REPORT
    Summary Sheet
     
     
    PURCHASE ORDER No:

     
     
    REPORT No:                       PART No:

    SUPPLIER: Drawing Issue:

     

     

    Layout Issue:

     

    Serial No. Ass.:

     

    TITLE / DESCRIPTION:      
    DRAWING SPECIFICATIONS, INCLUDING ANY EMBODIED MODIFICATIONS, WQN’s, DOI’s etc.

     

     

    SUMMARY
    NR – Not Relevant – Please tick if considered acceptable    Appx - Appendix/Substantiating Data

    DETAIL ATTRIBUTES

     

    ACCEPT
     
    ASSEMBLY ATTRIBUTES

     

    ACCEPT

      NR YES NO APPX     NR YES NO APPX
    PUR ORDER REQ’S           PUR ORDER REQ’S        
    PLANNING / C.O.S.           PLANNING / C.O.S.        
    MATERIAL VERIFICATION           MATERIAL VERIFICATION        
    SPEC. COMPLIANCE           SPEC. COMPLIANCE        
    PROCESSING           PROCESSING        
    TEMPER AND HARDNESS           TEMPER AND HARDNESS        
    NON DESTRUCTIVE TEST           NON DESTRUCTIVE TEST        
    FUNCTIONAL TEST           FUNCTIONAL TEST        
    FINISH REQUIREMENTS           FINISH REQUIREMENTS        
    IDENTIFICATION           IDENTIFICATION        
    DIMENSIONAL INSPECTION           DIMENSIONAL INSPECTION        
    TOOLING           TOOLING        
    CONFIGURATION           CONFIGURATION        
    REMARKS   (Be specific – make sketch is necessary. Use continuation sheet if required

     

     

    Final Material Condition

     

    INSPECTION (Signature & Stamp)

     

    APPROVED BY (Signature)

     

    For RCJI Use:

     

    ENGINEERING REP

     

     

    ACC NOT ACC TOOLING REP

     

    ACC NOT ACC QUALITY REVIEW / APPROVED

     

    ACC NOT ACC

    Back to top



    Q7B-127A - Issue 4