1. Section 1. To be completed by James Walker
      2. Section 2. To be completed by customer

Version No.
JWUK Deviation Permit
Owner
Effective
Date
Doc Ref: QAF-062
1.0
 
J Taylor
20/03/19

 

 


Section 1. To be completed by James Walker

Permit Number
JWUK-PN-00798
Customer Name
PARKER HANNIFIN LTD (GCS)
Customer Location
 
JW Order Number
8158199
Date
 

 

JW Part Number
JW Material/Part Description
Customer Part Number
Customer Drawing Number
CMRS3171631 RUBBER/SPRING SEAL EXTERNAL HYDROGENATED NITRILE ELAST-O-LION® 101 API 6A:21 PSL3 (+QP-000297-01 REV. 01) (CAMERON) WITH STAINLESS STEEL SPRING(S) WITH MACHINED GROOVE(S) OD 356.41MM S 8.26MM DP 11.68MM DRAWING NO. JWC-FP-217333 REV.-    

 

Description of Deviation Discrepancy between the Machined Drawing and The Blank Drawing in relation to the Diameter of the Springs
Need for Deviation It is understood that the 3.2mm as per the blank DWG X-272926-02 rev 01 is required and not .094” (2.4mm) as per the final machined DWG X-272927-02 rev 01. James Walker is therefore seeking formal confirmation that this is correct.
 
Permanent Deviation? Yes
Responsible Person and Role James Taylor Senior Applications Engineer
Date, Signature 08.03.2021.

 


Section 2. To be completed by customer

Accepted? Yes/No
Comments from Customer Contact  
Responsible Person and Role  
Date, Signature  

 

Standard Provisions

1.   This deviation will become permanent for all future orders and is not exclusive to just the purchase order outlined on the permit, unless otherwise stated

2.   This deviation will be captured in our customer notes and a copy of the deviation will not be supplied with shipped goods as standard, although it may be referenced in the James Walker part description

Back to top